Kentwood Public Schools EKHS Athletic Storage Building

Info

Size: 3,840 Sq Ft

Cost: $450,000

Completion: April 2023


Details

Sitting outside of the East Kentwood Falcon Stadium is a new 3,800 SF athletic storage building. Construction began in the spring of 2022 and was completed in the spring of 2023.


With 2 garage doors that give easy access from the stadium this storage building assists all the athletic teams that use Falcon Stadium for their athletic events by providing extra space to house their equipment. The interior of the storage building is simply 4 block walls leaving the maximum amount of floor space to be used to storage.