Jack Brown Produce Waste Water Treatment Plan
- Amanda Bremer
- Aug 4, 2017
- 1 min read
Updated: Jan 25, 2022
Info
Size: 2,700 Sq Ft
Cost: $2.6M
Completion: 2017
Details
This project was based on the owner's need to have all the grey/discharge water be treated prior to entering the drain field system. This system is monitored both onsite and offsite for 24/7 operation. The waste water treatment equipment was manufactured in Texas specifically for this application. The new building was built with a CMU structure with a precast roof system as well as a cast-in-place tank system that resides next to the building.