Info
Size:
Cost: $671,000
Completion: 2016
Details
This project was a two part project to dismantle the existing church steeple from the 1960's and erecting a new 3 ring steeple and cross to represent the trinity to the church. The existing steel and wood steeple was over 50 years old and had obtained some structural damage. Along with the steeple replacement, the church received HVAC upgrades to include air conditioning, which the church did not have. The goal for the HVAC upgrades was to give the church cooling options without the noise interference and to maintain the original look of the interior of the church.
Comments