Info
Size: 8,000 Sq Ft
Cost: $1.2M
Completion: 2018
Details
This project included the demolition of an existing zinc plate line that had been through over 30 years of use. Once the old equipment and floor trenching system was removed, a new flooring layout was poured and included new trenches and curbs for the equipment. An electrical upgrade was also needed to power the new equipment line.